Factory Charter - IFC Build-Out
Factory Charter — IFC Build-Out
Type: P3 Factory Charter
Charter ID: FC-IFC-2026-001
Dossier binding key: SD-IFC-2026-001
Programme: Informed Financial Consent (IFC) — Strategy Dossier - IFC
Factory: NAVV Founders (Brian and Andrew)
Issued: 2026-05-10
Epoch: IFC Build-Out — from 2026-05-10 until epoch horizon is met (see Dossier)
Status: Active
Grant of Authority
This Charter grants bounded production authority to the NAVV Founders Factory (Brian and Andrew) to produce within the corridor defined by Strategy Dossier - IFC (SD-IFC-2026-001).
Production authority is granted for the following scope:
- Design, build, and iterate the five IFC component tools (Components #1–#5), individually and collectively
- Produce and maintain Product Briefs, Factory Charters, Sagas, and governance artefacts that cite SD-IFC-2026-001
- Engage with Andrew's NotebookLM notebook for requirements extraction and review
- Deploy the IFC tool suite in SC/PRC practitioner contexts and collect operational signals
Scope Constraints
This Charter does not authorise production outside the IFC Dossier's corridor. The sacrifice list in Strategy Dossier - IFC (Section 4) defines what is explicitly excluded. Factory output that would cross into Core Support provision, Plan Management, SIL, clinical therapy, or crisis response is out of scope for this Charter.
The non-duplication rule and least-cost-appropriate-provider decision rule apply to all IFC tool outputs.
Corridor Walls (Active Principles)
Production within this Charter is constrained by the four foregrounded principles cited in SD-IFC-2026-001:
| Principle | Constraint |
|---|---|
| PR-A001 — NDIS Legislative Supremacy | All tools must remain grounded in R106, s33(2), s34(1)(a) |
| PR-R001 — PAPL Currency | All price references must reflect the current PAPL version |
| PR-I003 — Participant data sovereignty | No IFC tool may transmit participant data to an external server |
| PR-I001 — Managed Conflict of Interest | Sacrifice list is a governance constraint, not a business preference |
Sentinel Responsibilities Within This Charter
| Sentinel | Domain | Responsibility |
|---|---|---|
| Andrew | Market-facing | Product direction, requirements, strategic objectives, review and approval of drafts |
| Brian | Operational | Process design, governance, quality standards, architectural decisions |
Neither sentinel resolves decisions within the other's domain unilaterally. Escalation is mandatory where domains intersect.
Epoch Horizon and Decommissioning
This Charter is decommissioned when the IFC Strategy Dossier epoch horizon is met: all five component tools have been used in at least one complete NDIS planning cycle and at least one NDIA response (Statement of Participant Supports) has been received for each.
At decommissioning:
- This Charter is formally closed
- The IFC Saga (FC-IFC-2026-001) is resolved — completed, frozen, or transferred to a successor Dossier
- Products and completed Sagas are absorbed into NAVV's institutional memory
- A Strategy Sentinel review determines whether to issue a successor Dossier or close the Programme
Issued: 2026-05-10. Authorised under Strategy Dossier - IFC (SD-IFC-2026-001).