NAVV Maturity Assessment - 2026-05-08

NAVV Maturity Assessment — 2026-05-08

Type: P3 Maturity Artefact — Stage 1
Prepared by: Sonnet (Sub-agent Manager)
Commissioned: Missive NAVV-2026-05-08 — Stage 1 of P3 scaffolding
Sentinel authority: Brian (Maturity pillar)
Reference: P3 Minimum Viable Maturity


Purpose

This document provides an honest, practice-level capability profile of NAVV as of 2026-05-08. It sets the ceiling for safe governance complexity and calibrates the Strategy Sieve against Brian's revised Direction Statement.

Maturity is the boundary of reliable execution. What we assess here is not what we aspire to — it is what we can sustain repeatedly, by both founders, under ordinary conditions.


Maturity Scale Used

Level Name Definition
L1 Initial (Ad-hoc) Inconsistent; outcomes depend on specific individuals; not teachable from materials alone
L2 Managed (Repeatable) Documented; broadly consistent outcomes; a new practitioner can onboard from materials
L3 Defined (Standardised) Embedded in tooling or infrastructure that enforces consistency without relying on individual discipline
L4 Measured (Managed) Instrumented; performance data collected and reviewed; degradation detectable before failure

Ratchet Teeth convert capability gains into permanent features:

Tooth Mechanism Holds against
T1 Documentation Ignorance and turnover
T2 Tooling Forgetfulness and drift
T3 Governance Pressure and exception-creep
T4 Culture Time and leadership change

Practice Capability Profile

Andrew-Sentinel Domains (Principle, Product, Strategy)

Practice Area Level Ratchet Tooth Evidence Gap to Next Level
Requirements capture L2 T2 NbLM intake cycle is structured (threshold criteria) and tooled (notebook_query protocol documented in CLAUDE.md) Automated threshold detection (currently LLM-assessed, not script-verified)
Product design and intent L1–L2 T1 v7 HTML prototype exists as working artefact; no formal product brief yet Formal product brief (Stage 3) will advance to L2
Strategic direction L1 T1 Direction Statement drafted and approved (2026-05-08); previously implicit in CLAUDE.md Formal Direction Statement (Stage 4) in place; needs a review cadence to reach L2

Brian-Sentinel Domains (Pattern, Maturity, Governance)

Practice Area Level Ratchet Tooth Evidence Gap to Next Level
Workflow pattern recognition L1–L2 T1 Intake, ingestion, and review cycles are documented in CLAUDE.md; not yet formally named as P3 patterns Formal pattern documentation in Patterns/ folder
Product-facing market patterns L1 T0 Not yet identified or extracted; acknowledged as a distinct domain in Brian's feedback Extraction via P3 filter in NbLM (Part 2 of impact assessment)
Maturity assessment L1 → T1 T1 (this document) No formal assessment prior to today Regular cadence (annual minimum) needed to reach L2
Operational governance L2 T2 Missive protocol documented AND tooled (freeze-line, Questions Log, .claude/commands/); consistently enacted Formal six-element governance structures (Stage 5) would advance to L3

Cross-Cutting Domains

Practice Area Level Ratchet Tooth Evidence Gap to Next Level
Content development (wiki ingestion) L2 T1–T2 RS ingestion workflow documented; registry.py handles structural tasks End-to-end automated verification (Phase F script-based QA)
Quality assurance L1–L2 T1–T2 registry.py handles structural QA; content QA is LLM-assessed Script-based verification per P3 Experiment Lessons (reduce LLM QA)
Delivery pipeline (NbLM) L1 T1 source_add protocol documented; no automated pipeline Automated delivery trigger is a Grow priority, not Now
Review and iteration L2 T2 Missive-driven review cycle consistently applied; freeze-line mechanism enforced No identified blocker — sustained practice will reach L3 with tooling

Frontier Summary

Inside the capability frontier (reliable execution):

  • Structured requirements capture via NbLM
  • Wiki content development (RS ingestion workflow)
  • Operational governance (Missive protocol, freeze-line)
  • Structural quality assurance (registry.py)
  • Review and iteration (Missive-driven)

At the capability boundary (heroic effort required):

  • Product design formalisation (brief templates not yet populated)
  • Multi-notebook workflow management (not yet implemented)
  • Workflow pattern documentation (identified but not yet formally named)

Outside the current frontier (capability does not yet exist):

  • Market-facing product pattern identification (requires NbLM filter extraction)
  • Automated delivery pipeline
  • Cross-notebook portfolio management
  • Seed fundraising processes

Strategy Sieve — Calibration Against Direction Statement

Applying the Now / Grow / Recalibrate sieve to the strategic elements in Brian's approved Direction Statement (2026-05-08):

Strategic Element Sieve Basis
Distributed P3 governance model Grow Implementation is the scaffolding work now underway; Ratchet schedule = Stages 0–5
Testing existing products (PST, NDIS-Wiki) Now Both products are active; content development and iteration capability is at L2
Andrew's market-facing sentinel role (formal) Grow Andrew has domain expertise; formal sentinel structure (Stages 2–3) is the Ratchet schedule
Brian's operational sentinel role (formal) Now Missive protocol and governance structures at L2; sentinel authority is enacted
Testing new product vectors (Andrew's expansion) Grow New notebooks/products require notebook registry and multi-notebook workflow not yet in place
Seeking seed funding Recalibrate No fundraising capability, business narrative, or investor documentation exists; this is a future strategic objective, not a current executable

Recalibrate finding — seed funding: Seeking seed funding requires capabilities NAVV does not currently have: a formalised business narrative, investor-ready documentation, and fundraising process. The Direction Statement acknowledges this as a direction of travel, not a current commitment. No action needed now — but this finding should be revisited when product validation is complete. Recalibrate does not mean abandon.


Next Maturity Review

Recommended: Annual review minimum, triggered additionally by:

  • Any significant change to NAVV's operational structure
  • Launch of a new product (new notebook)
  • Completion of Stage 5 (governance structures formalised)

Artefact status: Active — first formal maturity assessment. Supersedes any informal estimates.