Saga - IFC Build-Out

Saga — IFC Build-Out

Type: P3 Saga (append-only operational record)
Saga ID: SG-IFC-2026-001
Charter binding key: FC-IFC-2026-001
Dossier binding key: SD-IFC-2026-001
Programme: Informed Financial Consent (IFC)
Factory: NAVV Founders (Brian and Andrew)
Opened: 2026-05-10
Status: Open


Append-only. Entries are added chronologically. No entry is ever modified or deleted. This Saga is the upstream signal to the Strategy Sentinel about whether the IFC direction is working.


Pre-Charter History (Summary)

The IFC Programme's formal epoch begins with the issuance of SD-IFC-2026-001 on 2026-05-10. The following summarises material production activity prior to Charter issuance, to provide an accurate operational picture from inception.

Prototype development (pre-2026-05-08):
Andrew developed the Participant Statement Toolkit through an ad-hoc AI-assisted process, producing v1 through v7. The v7 prototype implements 22 of 23 requirements (R-001 through R-022 active; R-023 — save function — pending). The prototype is a fully self-contained browser-based HTML file with no external dependencies or data transmission.

P3 governance scaffolding (2026-05-08):
Brian established the P3-Governance structure for NAVV:

IFC structure identified (2026-05-09):
NbLM extraction pass on the IFC notebook (07344d6e-933e-43f0-81e2-8576ff93e178) revealed that IFC is a Programme (not a Product) — a strategic framework holding five component tools. Product Brief - Participant Statement Toolkit validated as Component #4 (active). IFC Strategy Brief produced as working paper in Droppings/.

P3 Programme Guidance generated (2026-05-10):
P3 Programme Guidance produced to resolve Programme-level theory gaps in the P3 reference library — specifically: what a Programme is in P3 terms, the required artefact classes, and the lifecycle. Identified that the existing working paper constituted a valid Strategy Dossier pending formal issuance.


Saga Entries

Entry 001 — Programme Founding

Date: 2026-05-10
Type: Governance

The IFC Programme is formally established as a P3 Strategic Bundle.

Artefacts issued this entry:

Artefact ID Location
Strategy Dossier — IFC SD-IFC-2026-001 Strategy Dossier - IFC
Factory Charter — IFC Build-Out FC-IFC-2026-001 Factory Charter - IFC Build-Out
Saga — IFC Build-Out (this document) SG-IFC-2026-001 Saga - IFC Build-Out

Programme state at founding:

  • Component #4 (PST): v7 prototype active. 22/23 requirements implemented. R-023 (save function) pending. Brief validated.
  • Components #1, #2, #3, #5: not yet briefed.
  • P3-Governance folder structure: Charters/ and Sagas/ folders created this entry.

Strategy Sentinel signal: No recalibration signal active. Direction is confirmed viable. Build-out epoch begins.



Entry 002 — Programme Analysis and Structural Merge

Date: 2026-05-11
Type: Structural Decision + Analysis

Programme-level analysis of Andrew's Product Brief: 02 (IFC notebook, source adc198b5). Full analysis in Droppings/: Programme Analysis - Product Brief 02, Gap Analysis - Product Brief 02 vs P3 Baseline.

Key strategic findings:

  • Mark Butler's commissioning process is the primary external threat — the free market for coordination is ending; only commissioned providers will be approved to operate as navigators
  • New Framework Plans (delayed to April 2027) shift the NDIS from goals-led to needs-assessment-led — Participant Statement becomes a functional translation layer, not a plan driver
  • The hybrid SC/PRC model is confirmed as the IFC programme's strategic core. The Practice Rationale and Audit Framework (embedded in Product Brief: 02) provides the audit-defensible compliance architecture
  • Andrew's Goal 3 is absent — Choice and Control Flexibility Educator confirmed not intended as a standalone product

Structural decision enacted (Brian confirmed):
Component #3 (Choice and Control Flexibility Educator) merged into Component #1 (Visual Guide to the NDIS Plan) as Loop 4. Former standalone extract archived in Droppings/ as immutable history.

Artefacts updated this entry:

Artefact Change
Product Brief - Visual Guide to the NDIS Plan Loop 4 expanded to absorb Component #3; G-02 resolved; header updated
Strategy Dossier - IFC Component #3 row updated to reflect merged status
P3-Index Component #3 row updated to reflect merged status
NAVV Questions Log Q-023 closed (answered); Q-024 answered (Practice Rationale → wiki territory report)

Product portfolio state at this entry:

Component Status
#1 — Visual Guide to NDIS Plan (absorbs #3) Active — brief updated
#2 — Visual Guide to Service Agreement Active — G-01 (visual design) open
#3 — Choice and Control Flexibility Educator Merged into #1
#4 — Participant Statement Toolkit Active — update needed (New Framework Plans, Goal 5b)
#5 — Psychosocial Recovery Plan Active — dual progress report constraint to be added

Practice Rationale routing decision (Brian): The Practice Rationale and Audit Framework is not a product component — it is a candidate for the wiki's first Territory Report. This knowledge is routed to the wiki intellectual commons, not to the IFC product inventory.

Strategy Sentinel signal: No recalibration signal. The commissioning window (before April 2027) adds urgency to the epoch but does not change its definition.


Saga opened: 2026-05-10.
Authorised under Factory Charter - IFC Build-Out (FC-IFC-2026-001) and Strategy Dossier - IFC (SD-IFC-2026-001).